A structured model for estimation of automotive paint labour times
Luo, Xiaolin ; Shevchenko, Pavel ; Sayer, Brad ; Blackhall, Bill ; Coelho, Carlos
ANZIAM Journal, Tome 52 (2012), / Harvested from Australian Mathematical Society

As the old system known in the smash repairs industry as ``funny time, funny money" is being replaced by fairer systems based on empirical evidence, there is lack of rigorous analysis based on observed data and sound statistical methods. This paper proposes and calibrates a statistical model for estimating paint labour times. The model considers terms proportional to paint area such as sanding and spray time, and terms proportional to the perimeter of the panel representing panel masking and other panel boundary related work. Fine details such as `flash off' time, the number of paint layers and the number of coats per layer are also included into the model. The proposed model can be extended and calibrated for real commercial applications. References Australian Government. Smash repairers and insurers. Productivity Commission Inquiry Report No. 34, 17 March, 2005. P. R. Bevington. Data Reduction and Error Analysis for the Physical Sciences. New York: McGraw-Hill. Chapter 1--4. 1969. R. Von Mises. Mathematical Theory of Probability and Statistics. New York: Academic Press, 1964.

Publié le : 2012-01-01
DOI : https://doi.org/10.21914/anziamj.v53i0.5335
@article{5335,
     title = {A structured model for estimation of automotive paint labour times},
     journal = {ANZIAM Journal},
     volume = {52},
     year = {2012},
     doi = {10.21914/anziamj.v53i0.5335},
     language = {EN},
     url = {http://dml.mathdoc.fr/item/5335}
}
Luo, Xiaolin; Shevchenko, Pavel; Sayer, Brad; Blackhall, Bill; Coelho, Carlos. A structured model for estimation of automotive paint labour times. ANZIAM Journal, Tome 52 (2012) . doi : 10.21914/anziamj.v53i0.5335. http://gdmltest.u-ga.fr/item/5335/