A priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penalties.
Najafi, Amir Abbas ; Azimi, Fatemeh
Mathematical Problems in Engineering, Tome 2009 (2009), / Harvested from The Electronic Library of Mathematics
Publié le : 2009-01-01
DOI : https://doi.org/10.1155/2009/106425
EUDML-ID : urn:eudml:doc:45791
@article{05632433,
     title = {A priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penalties.},
     journal = {Mathematical Problems in Engineering},
     volume = {2009},
     year = {2009},
     doi = {10.1155/2009/106425},
     zbl = {1181.90123},
     language = {en},
     url = {http://dml.mathdoc.fr/item/05632433}
}
Najafi, Amir Abbas; Azimi, Fatemeh. A priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penalties.. Mathematical Problems in Engineering, Tome 2009 (2009) . doi : 10.1155/2009/106425. http://gdmltest.u-ga.fr/item/05632433/