Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm.
Che, Ada ; Chu, Chengbin
Mathematical Problems in Engineering, Tome 2008 (2008), / Harvested from The Electronic Library of Mathematics
Publié le : 2008-01-01
DOI : https://doi.org/10.1155/2008/364279
EUDML-ID : urn:eudml:doc:54910
@article{05372473,
     title = {Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm.},
     journal = {Mathematical Problems in Engineering},
     volume = {2008},
     year = {2008},
     doi = {10.1155/2008/364279},
     zbl = {1152.78004},
     language = {en},
     url = {http://dml.mathdoc.fr/item/05372473}
}
Che, Ada; Chu, Chengbin. Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm.. Mathematical Problems in Engineering, Tome 2008 (2008) . doi : 10.1155/2008/364279. http://gdmltest.u-ga.fr/item/05372473/