Bottlenecks with respect to due-time performance in pull serial production lines.
Li, Jingshan ; Meerkov, Semyon M.
Mathematical Problems in Engineering, Tome 5 (2000), p. 479-498 / Harvested from The Electronic Library of Mathematics
Publié le : 2000-01-01
DOI : https://doi.org/10.1155/S1024123X99001209
EUDML-ID : urn:eudml:doc:48956
@article{01471388,
     title = {Bottlenecks with respect to due-time performance in pull serial production lines.},
     journal = {Mathematical Problems in Engineering},
     volume = {5},
     year = {2000},
     pages = {479-498},
     doi = {10.1155/S1024123X99001209},
     zbl = {0972.90022},
     language = {en},
     url = {http://dml.mathdoc.fr/item/01471388}
}
Li, Jingshan; Meerkov, Semyon M. Bottlenecks with respect to due-time performance in pull serial production lines.. Mathematical Problems in Engineering, Tome 5 (2000) pp. 479-498. doi : 10.1155/S1024123X99001209. http://gdmltest.u-ga.fr/item/01471388/