Analysis of a production system with a feedback buffer and a general dispatching time.
Lee, Ho Woo ; Ahn, Boo Yong
Mathematical Problems in Engineering, Tome 5 (2000), p. 421-439 / Harvested from The Electronic Library of Mathematics
Publié le : 2000-01-01
DOI : https://doi.org/10.1155/S1024123X99001179
EUDML-ID : urn:eudml:doc:50937
@article{01441907,
     title = {Analysis of a production system with a feedback buffer and a general dispatching time.},
     journal = {Mathematical Problems in Engineering},
     volume = {5},
     year = {2000},
     pages = {421-439},
     doi = {10.1155/S1024123X99001179},
     zbl = {1046.90022},
     language = {en},
     url = {http://dml.mathdoc.fr/item/01441907}
}
Lee, Ho Woo; Ahn, Boo Yong. Analysis of a production system with a feedback buffer and a general dispatching time.. Mathematical Problems in Engineering, Tome 5 (2000) pp. 421-439. doi : 10.1155/S1024123X99001179. http://gdmltest.u-ga.fr/item/01441907/